Air Conditioning and Ventilation (MAC)
This section of the drawings includes 73 sheets, with details of the air conditioning system designed by Israel A. Naman. Detailed drawings show the location of ductwork and vents in office and ticket areas, the air conditioning control diagram, and details of boilers and cooling towers. Some of this infrastructure was replaced or modified during the 1988 renovation of the Astrodome.
Table of Contents
Sheet No. | Title |
COVER | |
INDEX | |
MAC-1 | LEVEL NO. 1 PIPING LOOP SYS. |
MAC-2 | ROOF PLAN |
MAC-3 | S. W. QUADRANT LEVEL NO. 1 |
MAC-4 | N. W. QUADRANT LEVEL NO. 1 |
MAC-5 | N. E. QUADRANT LEVEL NO. 1 |
MAC-6 | S. E. QUADRANT LEVEL NO. 1 |
MAC-7 | S. W. QUADRANT LEVEL NO. 2 |
MAC-8 | N. W. QUADRANT LEVEL NO. 2 |
MAC-9 | N. E. QUADRANT LEVEL NO. 2 |
MAC-10 | S. E. QUADRANT LEVEL NO. 1 |
MAC-11 | S. W. QUADRANT LEVEL NO. 3 |
MAC-12 | N. W. QUADRANT LEVEL NO. 3 |
MAC-13 | N. E. QUADRANT LEVEL NO. 3 |
MAC-14 | S. E. QUADRANT LEVEL NO. 3 |
MAC-15 | S. W. QUADRANT LEVEL NO. 4 |
MAC-16 | N. W. QUADRANT LEVEL NO. 4 |
MAC-17 | N. E. QUADRANT LEVEL NO. 4 |
MAC-18 | S. E. QUADRANT LEVEL NO. 4 |
MAC-19 | S. W. QUADRANT LEVEL NO. 5 |
MAC-20 | N. W. QUADRANT LEVEL NO. 5 |
MAC-21 | N. E. QUADRANT LEVEL NO. 5 |
MAC-22 | S. E. QUADRANT LEVEL NO. 5 |
MAC-23 | S. W. QUADRANT LEVEL NO. 6 |
MAC-24 | N. W. QUADRANT LEVEL NO. 6 |
MAC-25 | N. E. QUADRANT LEVEL NO. 6 |
MAC-26 | S. E. QUADRANT LEVEL NO. 6 |
MAC-27 | S. W. QUAD. LEVEL NO. 7 CON. |
MAC-28 | N. W. QUAD. LEVEL NO. 7 CON. |
MAC-29 | N. E. QUAD. LEVEL NO. 7 CON. |
MAC-30 | S. E. QUAD. LEVEL NO. 7 CON. |
MAC-31 | S. W. QUAD. LEVEL NO. 7 SEAT. |
MAC-32 | N. W. QUAD. LEVEL NO. 7 SEAT. |
MAC-33 | N. E. QUAD. LEVEL NO. 7 SEAT. |
MAC-34 | S. E. QUAD. LEVEL NO. 7 SEAT. |
MAC-35 | S. W. QUADRANT LEVEL NO. 9 |
MAC-36 | N. W. QUADRANT LEVEL NO. 9 |
MAC-37 | N. E. QUADRANT LEVEL NO. 9 |
MAC-38 | S. E. QUADRANT LEVEL NO. 9 |
MAC-39 | TYP. BUILT-UP A. C. UNIT LEV. NO. 2 |
MAC-40 | TYP. BUILT-UP A. C. UNIT LEV. NO. 7 |
MAC-41 | TYP SECT. "A-A" BUILT-UP UNITS |
MAC-42 | RADIAL SECT. AIR DISTRIBUTION |
MAC-43 | TYP. C. FIELD B. U. UNIT LEV. NO. 2 |
MAC-44 | H. S. A. OFFICE AREA LEV. NO. 3 |
MAC-45 | TICKET SALES - DINING LEV. NO. 3 |
MAC-46 | OFFICES LEVEL NO. 3 |
MAC-47 | PRESS CLUB LEVEL NO. 5 |
MAC-48 | A. C. CONTROL DIAGRAMS |
MAC-49 | DETAILS |
MAC-50 | PIPING RISER DIAGRAMS |
MAC-51 | PIPING RISER DIAGRAMS |
MAC-52 | PIPING RISER DIAGRAMS |
MAC-53 | PIPING RISER DIAGRAMS |
MAC-54 | SCHEDULE OF A. C. UNITS |
MAC-55 | SCHEDULE OF A. C. UNITS |
MAC-56 | FLOW DIAGRAM, STEAM, H. WATER |
MAC-57 | FLOW DIAGRAM, REFRIGERATION |
MAC-58 | FLOW DIAGRAM, WATER |
MAC-59 | SCHEDULE-VALVES, THERMOWELLS |
MAC-60 | SCHEDULE- PUMPS, INDICATORS |
MAC-61 | SCHEDULE- CONTROLS, RELAYS |
MAC-62 | N. E. QUAD. LEVEL NO. I COL. 51 - 54 |
MAC-63 | S. E. QUAD LEVEL NO. I COL. 55-59 |
MAC-64 | EQUIP. RM. SECT. LEVEL NOS. I B 2 |
MAC-65 | EQUIP. RM. PLAN LEVEL NO. I |
MAC-66 | EQUIP. RM. SECT. LEVEL NO. I |
MAC-67 | EQUIP. RM. PLAN LEVEL NOS. 18 2 |
MAC-68 | EQUIP. RM. PLAN LEVEL NO. 2 |
MAC-69 | EQUIP. RM. BOILER STACK DETS. |
MAC-70 | COOLING TOWER |
MAC-71 | VESSELS |
MAC-72 | CONTROL DIAGRAM |
MAC-73 | A. C. CONTROL - SCANNING |